31. The normal time required for the comple-tion of project in the above problem is
A. 9 days
B. 13 days
C. 14 days
D. 19 days
Explanation:
32. For a given size of bucket, the ideal output of a dragline will be least in
A. Moist loam
B. Sand and gravel
C. Good common earth
D. Wet sticky clay
Explanation:
33. Assertion (A): Activity 5-7 is critical. Reason (R) : Earliest finish time and latest finish time for events 5-7 are same Select the correct answer.
A. A is correct but R is not correct
B. R is correct but A is not correct
C. both A and R are correct
D. both A and R are incorrect
Explanation:
34. The area under the Beta - distribution curve is divided into two equal parts by
A. most likely time
B. optimistic time
C. pessimistic time
D. expected time
Explanation:
35. The time corresponding to minimum total project cost is
A. crash time
B. normal time
C. optimistic time
D. between normal time and crash time
Explanation: