21. The direct cost of a project with respect to normal time is
A. minimum
B. maximum
C. zero
D. infinite
Explanation:
22. Which of the following earth moving machines has the shortest cycle time?
A. Drag line
B. Hoe
C. Clam shell
D. Dipper shovel
Explanation:
23. In the network shown in Fig. , activity 4-5 can be started only when
A. activity 3-4 is completed
B. activity 2�4 is completed
C. activity 2-3 is completed
D. activity 2-4 and 2>-A both are com-pleted
Explanation:
24. Interfering float is the difference between
A. total float and free float
B. total float and independent float
C. free float and independent float
D. none of the above
Explanation:
25. A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these phone calls were an activity in PERT project, then phone calls expected duration will be
A. 15 minutes
B. 20.143 minutes
C. 21 minutes
D. 27 minutes