16.Consider the following features/factors : # Projects are of the non-repetitive type. # Time required need not be known. # Time required is known precisely. # Events have been established for planning. # Emphasis is given to activities of project. PERT is preferred for planning because of

1,2 and 4
3,4 and 5
1,3 and 4
1,2 and 5

17.A contractor has two options;� : Invest his money in project A or (II) : Invest his money in project B. If he decides to invest in A, for every rupee invested, he is assured of doubling his money in ten years. If he decides to invest in B, he is assured of making his money 1.5 times in 5 years. If the contractor values his money at 10% interest rate, he

should invest in neither of the two projects
could invest in either of the two projects
should invest in project A
should invest in project B

18.For excavating utility trenches with precise control of depth, the excavation equipment used is

Hoe
Shovel
Drag line
None of the above

19.Batching refers to

controlling the total quantity at each batch
weighing accurately, the quantity of each material for a job before mixing
controlling the quantity of each material into each batch
adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch

More Construction Planning And Management QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
Innovation distinguishes between a leader and a follower.-Steve Jobs