16. PMTP (predetermined motion time systems) include
A. MTM (method time measurement)
B. WFS (work factor systems)
C. BNTS (basic motion time study)
D. all of the above
E. none of the above
Explanation:
17. The two-bin system is concerned with
A. ordering procedure
B. forecasting sales
C. production planning
D. despatching and expediting
E. none of the above.
Explanation:
18. CPM is the
A. time oriented technique
B. event oriented technique
C. activity oriented technique
D. target oriented technique
E. work oriented technique.
Explanation:
19. String diagram is used
A. for checking the relative values of various layouts
B. when a group of workers are working at a place
C. where processes require the operator to be moved from one place to another
D. all of the above
E. none of the above.
Explanation:
20. The basic difference between PERT and CPM is that
A. PERT deals with events and CPM with activities
B. critical path is determined in PERT only
C. costs are considered on CPM only and not in PERT
D. guessed times are used in PERT and evaluated times in CPM
E. PERT is used in workshops and CPM in plants.
Explanation: