6. The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as
A. Dry work Plan
B. Halsey Premium Plan
C. Taylor Plan
D. Bedaux Plan
E. Rowan Plan.
Explanation:
7. The simplex method is the basic method for
A. value analysis
B. operation research
C. linear programming
D. model analysis
E. none of the above.
Explanation:
8. Queing theory is used for
A. inventory problems
B. traffic congestion studies
C. job-shop scheduling
D. all of the above
E. none of the above.
Explanation:
9. In A-B-C control policy, maximum attention is given to
A. those items which consume money
B. those items which are not readily available
C. those items which are in more demand
D. those items which consume more money
E. proper quality assurance program-mes.
Explanation:
10. PERT is the
A. time oriented technique
B. event oriented technique
C. activity oriented technique
D. target oriented technique
E. work oriented technique.
Explanation: