Civil Engineering Questions And Answers :: Surveying: part4



Civil Engineering : Surveying QUESTIONS AND ANSWERS :: part4 : 21 to 25

Following Civil Engineering Multiple choice objective type questions and answers will help you in BSNL JTO, GATE 2024 and IES 2024 examinations :

21.Horizontal distances obtained by thermometric observations

require slope correction
require tension correction
require slope and tension corrections
do not require slope and tension corrections

22.Which of the following methods of theodolite traversing is suitable for locating the details which are far away from transit stations ?

measuring angle and distance from one transit station
measuring angles to the point from at least two stations
measuring angle at one station and distance from other
measuring distance from two points on traverse line

23.Bowditch rule is applied to

an open traverse for graphical adjustment
a closed traverse for adjustment of closing error
determine the effect of local attraction
none of the above

24.The type of surveying which requires least office work is

tacheomefry
trigonometrical levelling
plane table surveying
theodolite surveying

25.Three point problem can be solved by

Tracing paper method
Bessels method
Lehman's method
all of the above

More Surveying QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
The only place where success comes before work is in the dictionary.- Vidal Sassoon