Civil Engineering Questions And Answers :: Surveying: part4



Civil Engineering : Surveying QUESTIONS AND ANSWERS :: part4 : 16 to 20

Following Civil Engineering Multiple choice objective type questions and answers will help you in BSNL JTO, GATE 2024 and IES 2024 examinations :

16.Detailed plotting is generally done by

radiation
traversing
resection
all of the above

17.After fixing the plane table to the tripod, the main operations which are needed at each plane table station are i) levelling ii) orientation iii) centering The correct sequence of these operations is

(i), (ii),.(iii)
(i), (iii), (ii)
(iii), (i), (ii)
(ii), (Hi), (i)

18.For a tacheometer the additive and multi-plying constants are respectively

0 and 100
100 and 0
0 and 0
100 and 100

19.The process of determining the locations of the instrument station by drawing re sectors from the locations of the known stations is called

radiation
intersection
resection
traversing

20.Intersection method of detailed plotting is most suitable for

forests
urban areas
hilly areas
plains

More Surveying QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
Trust because you are willing to accept the risk, not because it’s safe or certain