Irrigation Water Resources Engineering - Interview Questions and Answers
Prepare for your technical interview with these Irrigation Water Resources Engineering questions.
Ready to test your skills?
Take a timed mock test specifically for Irrigation Water Resources Engineering.
31. To determine the discharge at a section in a stream from its rating curve, the required data are
i) slope of water surface at the section
ii) stage at the section iii) current meter readings at the section The correct answer is
Explanation:
32. To estimate the magnitude of a flood with a return period of T years, Gumbel's distribution method requires the following data pertaining to annual flood series
i) mean value
ii) standard deviation
iii) length of record
iv) coefficient of skew
The correct answer is
Explanation:
33. The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be
Explanation:
34. Instantaneous unit hydrograph is a hydrograph of
i) unit duration
ii) unit rainfall excess
iii) infinitely small duration
iv) infinitely small rainfall excess
The correct answer is
Explanation:
35. The value of Sodium Absorption Ratio for high sodium water lies between
Explanation: