Irrigation Water Resources Engineering - Interview Questions and Answers

Prepare for your technical interview with these Irrigation Water Resources Engineering questions.

Ready to test your skills?

Take a timed mock test specifically for Irrigation Water Resources Engineering.

Start Mock Test
31. To determine the discharge at a section in a stream from its rating curve, the required data are i) slope of water surface at the section ii) stage at the section iii) current meter readings at the section The correct answer is
A. (i) and (ii)
B. (ii) and (iii)
C. only (ii)
D. only (iii)
Explanation:
32. To estimate the magnitude of a flood with a return period of T years, Gumbel's distribution method requires the following data pertaining to annual flood series i) mean value ii) standard deviation iii) length of record iv) coefficient of skew The correct answer is
A. (i) and (ii)
B. (i),(iD and (iii)
C. (i), (ii) and (iv)
D. (i), (ii), (iii) and (iv)
Explanation:
33. The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be
A. 20 3/sec
B. 25 m3/sec
C. 30 m3/sec
D. 35 m3/sec
Explanation:
34. Instantaneous unit hydrograph is a hydrograph of i) unit duration ii) unit rainfall excess iii) infinitely small duration iv) infinitely small rainfall excess The correct answer is
A. (i) and (ii)
B. (i)and(iv)
C. (ii) and (iii)
D. (iii) and (iv)
Explanation:
35. The value of Sodium Absorption Ratio for high sodium water lies between
A. 0 to 10
B. 10 to 18
C. 18 to 26
D. 26 to 34
Explanation: