61. If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be
Explanation:
62. A current meter is used to measure the
Explanation:
63. The uplift pressure on a dam can be controlled by
i) constructing cutoff under upstream face
ii) constructing drainage channels bet-ween the dam and its foundation
iii) by pressure grouting in foundation
The corret answer is
Explanation:
64. For a flood control reservoir, the effective storage is equal to
Explanation:
65. The useful storage is the volume of water stored in the reservoir between
Explanation: