11. A hyetograph is a graphical representation of
A. rainfall intensity and time
B. rainfall depth and time
C. discharge and time
D. cumulative rainfall and time
Explanation:
12. The stream which does not have any base flow contribution is called
A. perennial stream
B. intermittent stream
C. ephemeral stream
D. none of the above
Explanation:
13. Assertion A : To estimate the rainfall over a catchment, the number of raingauges required per unit area is large for hilly areas. Reason R : Rainfall gradient is steep. Select your correct answer according to the coding system given below :
A. Both A and R are true and R is the correct explanation of A
B. Both A and R are true but R is not the correct explanation of A
C. A is true but R is false
D. A is false but R is true
Explanation:
14. The net speed under which the turbine reaches its peak efficiency is called
A. design speed
B. rated speed
C. gross speed
D. operating speed
Explanation:
15. A land is known as waterlogged
A. when the permanent wilting point is reached
B. when gravity drainage has ceased
C. capillary fringe reaches the root zone of plants
D. none of the above