76. A multipurpose reservoir is the one which is
A. designed for one purpose but serves more than one purpose
B. planned and constructed to serve various purposes
C. both (a) and (b)
D. none of the above
Explanation:
77. The area between the isohyets 45 cm and 55 cm is 100 square km and between 55 cm and 65 cm is 150 square km. The average depth of annua! precipitation over the above basin of 250 square km will be
A. 50 cm
B. 55 cm
C. 56 cm
D. 60 cm
Explanation:
78. A deep well
A. is always deeper than a shallow well
B. has more discharge than a shallow well
C. is weaker structurally than a shallow well
D. both (a) and (b)
Explanation:
79. The best unit duration of storm for a unit hydrograph is
A. 1 hour
B. one-fourth of basin lag
C. one-half of basin lag
D. equal to basin lag
Explanation:
80. Dimensions of coefficient of transmissibility are
A. M�L�T�
B. rvfL'T"1
C. M� L2 T1
D. M'LV
Explanation: