6. A runoff river plant
A. is a medium head scheme
B. generates power during peak hours only
C. is suitable only on a perennial river
D. has no pondage at all
Explanation:
7. A river bend characterized by silting
A. scouring on concave side
B. silting on convex side
C. scouring on convex side and on concave side
D. scouring on concave side and silting on convex side
Explanation:
8. The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to
A. load factor
B. plant factor
C. utilisation factor
D. both (a) and (b)
Explanation:
9. A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If
A. 4.5 cm
B. 6.0 cm
C. 7.5 cm
D. 9.0 cm
Explanation:
10. A hydroelectric scheme operating under a head of 80 m will be classified as
A. low head scheme
B. medium head scheme
C. high head scheme
D. none of the above
Explanation: