6. A runoff river plant
Explanation:
7. A river bend characterized by silting
Explanation:
8. The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to
Explanation:
9. A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If
Explanation:
10. A hydroelectric scheme operating under a head of 80 m will be classified as
Explanation: