86. If there are two canals taking off from each flank of a river, then there will be
Explanation:
87. Seepage through foundation in an earthen dam is controlled by providing
Explanation:
88. The maximum permissible eccentricity for no tension at the base of a gravity dam is
Explanation:
89. The main function of a divide wall is to
Explanation:
90. For wave action in dams, the maximum height of freeboard is generally taken to be equal to