Mechanical Engineering Questions And Answers :: Production Technology: part5



Mechanical Engineering : Production Technology QUESTIONS AND ANSWERS :: part5 : 6 to 10

Following Mechanical Engineering Multiple choice objective type questions and answers will help you in BSNL JTO, GATE 2024 and IES 2024 examinations :

6.Queing theory is used for

inventory problems
traffic congestion studies
job-shop scheduling
all of the above
none of the above.

7.In A-B-C control policy, maximum attention is given to

those items which consume money
those items which are not readily available
those items which are in more demand
those items which consume more money
proper quality assurance program-mes.

8.PERT is the

time oriented technique
event oriented technique
activity oriented technique
target oriented technique
work oriented technique.

9.Which one of the following represents a group incentive plan ?

Halsey Premium Plan
Bedaux Plan
Lincoln Plan
Rowan Plan
Taylor Plan.

10.Replacement studies are made on the fol-lowing basis:

annual cost method
rate of return method
total life average method
present worth method
any one of the above.

More Production Technology QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
A real entrepreneur is somebody who has no safety net underneath them. Henry Kravis