1.Choose the wrong statement Time study is used to

determine overhead expenses
provide a basis for setting piece prices or incentive wages
determine standard costs
determine the capability of an operator to handle the number of machines
compare alternative methods.

2.The standard time for a job is

total work content
basic time + relaxation time
total work content + basic time
total work content + delay contingency allowance
total work content + relaxation time.

3.Material handling in automobile industry is done by

overhead crane
trolley
belt conveyor
all of the above
none of the above.

4.TMU in method time measurement stands for

time motion unit
time measurement unit
time movement unit
technique measurement unit
time method unit.

5.One time measurement unit (TMU) in method time measurement system equals

0.0001 minute
0.0006 minute
0.006 minute
0.001 minute
0.06 minute.

More Production Technology QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
If you are not willing to risk the usual you will have to settle for the ordinary- Jim Rohn