11.Micro motion study is

analysis of a man-work method by using a motion picture camera with a timing device in the field of view
motion study* observed on enhanced time intervals
motion study of a sequence of operations conducted systematically
study of man and machine conducted simultaneously
scientific, analytical procedure for determining optimum work method.

12.Per cent idle time for men or machines is found by

work sampling
time study
method study
work study
ABC analysis.

13.Work sampling observations are taken on the basis of

detailed calculations
convenience
table of random numbers
past experience
fixed percentage of daily production.

14.What does symbol 'D' imply in work study

inspection
transport
delay/temporary storage
permanent storage
none of the above.

15.Job evaluation is the method-of determining the

relative worth of jobs
skills required by a worker
contribution of a worker
contribution of a job
effectiveness of various alternatives.

More Production Technology QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
The only place where success comes before work is in the dictionary.- Vidal Sassoon