6.Job enrichment technique is applied to

reduce labour monotony
overcome boring and demotivating work
make people happy
all of the above
none of the above.

7.Graphical method, simplex method, and transportation method are concerned with

break-even analysis
value analysis
linear programming
queuing theory
material handling.

8.The objective of time study is to determine the time required to complete a job by

fast worker
average worker
slow worker
new entrant
any one of the above.

9.Standard time as compared to normal time is

greater
smaller
equal
there is no such correlation
none of the above.

10.Break-even analysis can be used for

short run analysis
long run analysis
average of above two run analysis
there is no such criterion
none of the above.

More Production Management And Industrial Engineering QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
Trust because you are willing to accept the risk, not because it’s safe or certain