Mechanical Engineering Questions And Answers :: Production Management And Industrial Engineering: part1



Mechanical Engineering : Production Management And Industrial Engineering QUESTIONS AND ANSWERS :: part1 : 21 to 25

Following Mechanical Engineering Multiple choice objective type questions and answers will help you in BSNL JTO, GATE 2024 and IES 2024 examinations :

21.What does symbol 'O' imply in work study

operation
inspection
transport
delay temporary storage
none of the above.

22.Micro motion study is

analysis of a man-work method by using a motion picture camera with a timing device in the field of view
motion study observed on enhanced time intervals
motion study of a sequence of operations conducted systematically
study of man and machine conducted simultaneously
scientific, analytical procedure for determining optimum work method.

23.The break-even point represents

the most economical level of operation of any industry
the time when unit can run without i loss and profit
time when industry will undergo loss
the time when company can make maximum profits
time for overhauling a plant.

24.Expediting function consists in keeping a watch on

operator's activity
flow of material and in case of trouble locate source of trouble
minimising the delays
making efficient despatching
none of the above.

More Production Management And Industrial Engineering QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
If you are not willing to risk the usual you will have to settle for the ordinary- Jim Rohn