41. In perpetual inventory control, the material is checked as it reaches its
A. minimum value
B. maximum value
C. average value
D. middle value
E. alarming value.
Explanation:
42. The standard time for a job is
A. total work content
B. basie time + relaxation time
C. total work content + basic time
D. total work content + delay contigency allowance
E. total work content + relaxation time.
Explanation:
43. In micromotion study, therblig is described by
A. a symbol
B. an event
C. an activity
D. micro motions
E. standard symbol and colour.
Explanation:
44. Break-even analysis consists of
A. fixed cost
B. variable cost
C. fixed and variable costs
D. operation costs
E. none of the above.
Explanation:
45. Scheduling gives information about
A. when work should start and how much work should be completed during a certain period
B. when work should complete
C. that how idle time can be minimised
D. prcper utilisation of machines
E. none of the above.
Explanation: