Home > Mechanical Engineering > Production Management and Industrial Engineering

Production Management and Industrial Engineering - Interview Questions and Answers

Prepare for your technical interview with these Production Management and Industrial Engineering questions.

Ready to test your skills?

Take a timed mock test specifically for Production Management and Industrial Engineering.

Start Mock Test
6. 128. The simplex method is the basic method for
A. value analysis
B. operation research
C. linear programming
D. model analysis
E. none of the above.
Explanation:
7. Which of the following is not wage incentive plan
A. differential piece rate system
B. Rowan plan
C. Emerson plan
D. Taylor plan
E. Halsey plan.
Explanation:
8. One of the basic essentials of an incentive plan is that
A. a differential piece rate system should exist
B. minimum wages should be guaran�teed
C. provide incentive to group efficiency performance
D. all standards should be based on optimum standards of production
E. all standards should be based on time studies.
Explanation:
9. A big advantage of PERT over Gantt charts is that in the former case
A. activities and events are clearly shown
B. early start and late finish of an ac�tivity are clearly marked
C. activity times are clear
D. critical path can be easily determined
E. inter-relationship among activities is clearly shown.
Explanation:
10. Bin card is used in
A. administrative wing
B. workshop
C. foundary shop
D. stores
E. assembly shop.
Explanation: