6.which of the following plants ?

Base load plants
Peak load plants
Both (a) and (b)
none of the above

7.During load shedding

system power factor is changed
some loads are switched off
system voltage is reduced
system frequency is reduced Efficiency is the secondary consideration in

8.Direct conversion of heat into electrical energy is possible through

fuel cells
solar cells
MHD generators
none of the above

9.Which of the following should be used for extinguishing electrical fires ?

Water
Carbon tetrachloride fire extinguisher
Foam type fire extinguisher
CO2 fire extinguisher

10._______ will offer the least load.

Vacuum cleaner
Television
Hair dryer
Electric shaver

More Economics Of Power Generation QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
Failure defeats losers, failure inspires winners.-Robert T. Kiyosaki