Electrical Engineering Questions And Answers :: Economics Of Power Generation: part3



Electrical Engineering : Economics Of Power Generation QUESTIONS AND ANSWERS :: part3 : 1 to 5

Following Electrical Engineering Multiple choice objective type questions and answers will help you in BSNL JTO, GATE 2024 and IES 2024 examinations :

1.The connected load of a IVMIM uir consumer is around

5 kW
40 k\V
80 kW
120 kW

2.In an interconnected system, the diversity factor of the whole system

remains unchanged
decreases
increases
none of the above

3.Which of the following is not necessarily an advantage of interconnecting various power stations ?

Improved frequency of power supplied
Reduction in total installed capacity
Increased reliability
Economy in operation of plants

4.________ is invariably used for peak load

Nuclear power plant
Steam turbine plant
Pumped storage plant
None of the above

5.Which of the following power plants need the least period for installation ?

Thermal power plant
Diesel power plant
Nuclear power plant
Hydro-electric power plant

More Economics Of Power Generation QUESTIONS AND ANSWERS available in next pages