21.The load factor of domestic load is usually |
| 10 to 15% |
| 30 to 40% |
| 50 to 60% |
| 60 to 70% |
22.Salvage value of the plant is always |
| positive |
| negative |
| zero |
| any of the above |
23.For high value of diversity factor, a power station of given installed capacity will be in a position to supply |
| less number of consumers |
| more number of consumers |
| neither (a) nor (b) |
| either (a) or (b) |
More Economics Of Power Generation QUESTIONS AND ANSWERS available in next pages
-
Health is the greatest gift, contentment is the greatest wealth -Buddha
- TNTET 2021 - Practice
- SSC CGL 2021 - Practice
- TNPSC Group 2A 2021 - Practice
- IIT JEE
- IIT JEE Q&A
- TNPSC Answer Keys
- TNPSC Group 2 Syllabus
-
TNPSC Q&A

- Online Tests - TNPSC
- Online Tests - GK
- IBPS 2020-2021
- Online Tests - Bank
- Online Tests - RRB NTPC
- Online Tests - UGC NET
- Online Tests - TANCET
- Online Aptitude Test
-
Engineering

-
Programming

-
Basic Science

-
Quiz

- Plus Two Question Papers
- SSLC Question Bank
-
Aptitude Tests

-
Logical Reasoning

-
General Knowledge-Hindi

-
Indian History MCQ

-
Indian Geography MCQ

-
Indian Civics MCQ

-
Indian Economics MCQ

-
CTET Biology MCQ

-
CTET Chemistry MCQ

-
CTET Physics Solved MCQ

-
Arithmetic Tests

- Press Release
- FAQ
- Coaching Centres
- TNPSC Group 1 Syllabus
-
TNPSC Group IV Syllabus

- TRB 2017 in English PDF

- TRB 2017 in Tamil PDF

- TET
- TNTET