6.A unit hydro graph has one unit of

rainfall duration
rainfall excess
time base of direct runoff
discharge

7.For an annual flood series arranged in descending order of magnitude, the return for a magnitude listed at position period m in a total data N is

N/(m+l)
m/(N+l)
m/N
(N+l)/m

8.The shape of recession limb of a hydrograph depends upon

basin characteristics only
storm characteristics only
both (a) and (b)
none of the above

9.For a catchment area of 120 km2, the equilibrium discharge in m3/hour of an S-curve obtained by the summation of 6 hour unit hydro graph is

0.2 x 106
0.6 x 106
2.4 xlO6
7.2 xlO6

More Irrigation Water Resources Engineering QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
If you are not willing to risk the usual you will have to settle for the ordinary- Jim Rohn