Civil Engineering Questions And Answers :: Irrigation Water Resources Engineering: part5



Civil Engineering : Irrigation Water Resources Engineering QUESTIONS AND ANSWERS :: part5 : 1 to 5

Following Civil Engineering Multiple choice objective type questions and answers will help you in BSNL JTO, GATE 2024 and IES 2024 examinations :

1.A runoff river plant

is a medium head scheme
generates power during peak hours only
is suitable only on a perennial river
has no pondage at all

2.A river bend characterized by silting

scouring on concave side
silting on convex side
scouring on convex side and on concave side
scouring on concave side and silting on convex side

3.The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to

load factor
plant factor
utilisation factor
both (a) and (b)

4.A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If

4.5 cm
6.0 cm
7.5 cm
9.0 cm

5.A hydroelectric scheme operating under a head of 80 m will be classified as

low head scheme
medium head scheme
high head scheme
none of the above

More Irrigation Water Resources Engineering QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
If your ship doesn’t come in, swim out to meet it!-Jonathan Winters