21.Variability of rainfall is i) largest in regions of high rainfall ii) largest in coastal areas iii) largest in regions of scanty rainfall The correct answer is

only (i)
(i) and (ii)
only (iii)
(ii) and (iii)

22.The net head under which the turbine reaches its peak efficiency at synchronous speed is called

design head
rated head
gross head
operating head

23.A runoff river plant is

a low head scheme
a medium head scheme
a high head scheme
none of the above

24.To determine the discharge at a section in a stream from its rating curve, the required data are i) slope of water surface at the section ii) stage at the section iii) current meter readings at the section The correct answer is

(i) and (ii)
(ii) and (iii)
only (ii)
only (iii)

More Irrigation Water Resources Engineering QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
Trust because you are willing to accept the risk, not because it’s safe or certain