Civil Engineering Questions And Answers :: Irrigation Water Resources Engineering: part3



Civil Engineering : Irrigation Water Resources Engineering QUESTIONS AND ANSWERS :: part3 : 1 to 5

Following Civil Engineering Multiple choice objective type questions and answers will help you in BSNL JTO, GATE 2024 and IES 2024 examinations :

1.Silt excluders are constructed on the

river bed upstream of head regulator
river bed downstream of head regulator
canal bed upstream of head regulator
canal bed downstream of head regulator

2.If there are two canals taking off from each flank of a river, then there will be

one divide wall and one undersluice
one divide wall and two undersluices
two divide walls and one undersluice
two divide walls and two undersluices

3.Seepage through foundation in an earthen dam is controlled by providing

rock toe
horizontal blanket
impervious cut off
chimney drain

4.The maximum permissible eccentricity for no tension at the base of a gravity dam is

B/2
B/3
B/4
B/6

5.The main function of a divide wall is to

control the silt entry in the canal
prevent river floods from entering the canal
separate the undersluices from weir proper
provide smooth flow at sufficiently low velocity

More Irrigation Water Resources Engineering QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
Failure defeats losers, failure inspires winners.-Robert T. Kiyosaki