1.In a single bus-bar system there will be complete shut down when |
| fault occurs on the bus itself |
| fault occurs on neutral line |
| two or more faults occur simultaneously |
| fault occurs with respect to earthing |
2.The information to the circuit breaker under fault conditions is provided by |
| relay |
| rewirable fuse |
| H.R.C. only |
| all of the above |
3.To limit short-circuit current in a power system are used. |
| earth wires |
| isolators |
| H.R.C. fuses |
| reactors |
4.A balanced 3-phase system consists of |
| zero sequence currents only |
| positive sequence currents only |
| negative and zero sequence currents |
| zero, negative and positive sequence currents |
More Switchgear Protections QUESTIONS AND ANSWERS available in next pages
-
Health is the greatest gift, contentment is the greatest wealth -Buddha
- TNTET 2021 - Practice
- SSC CGL 2021 - Practice
- TNPSC Group 2A 2021 - Practice
- IIT JEE
- IIT JEE Q&A
- TNPSC Answer Keys
- TNPSC Group 2 Syllabus
-
TNPSC Q&A

- Online Tests - TNPSC
- Online Tests - GK
- IBPS 2020-2021
- Online Tests - Bank
- Online Tests - RRB NTPC
- Online Tests - UGC NET
- Online Tests - TANCET
- Online Aptitude Test
-
Engineering

-
Programming

-
Basic Science

-
Quiz

- Plus Two Question Papers
- SSLC Question Bank
-
Aptitude Tests

-
Logical Reasoning

-
General Knowledge-Hindi

-
Indian History MCQ

-
Indian Geography MCQ

-
Indian Civics MCQ

-
Indian Economics MCQ

-
CTET Biology MCQ

-
CTET Chemistry MCQ

-
CTET Physics Solved MCQ

-
Arithmetic Tests

- Press Release
- FAQ
- Coaching Centres
- TNPSC Group 1 Syllabus
-
TNPSC Group IV Syllabus

- TRB 2017 in English PDF

- TRB 2017 in Tamil PDF

- TET
- TNTET