1.In multiple point mooring system, vessel is secured to minimum of

two points
four points
six points
eight points

2.As compared to wall type breakwater, mound type breakwater

requires skilled labour
requires low maintenance cost
requires less material
results in less damage due to gradual failure

3.Assertion A : Intervention of undulations in the sea bed reduces the depth of wave at the section. Reason R : No wave can have a height greater than the depth of water through which it passes. Select your answer based on the coding system given below:

Both A and R are true and R is correct explanation of A.
Both A and R are true but R is not the correct explanation of A.
A is true but R is false.
A is false but R is true.

4.If the maximum spring rise is 2 m and height of the waves expected is 4 m , then the breakwater height above the datum will be

2.5 m
4 m
5 m
7 m

5.Dead weight tonnage of a ship i) varies with latitude and season ii) is more than displacement tonnage iii) is the difference between displacement load and displacement light Of these statements

i) and ii) are correct
ii) and iii) are correct
i) and iii) are correct
Only iii) is correct

More Docks And Harbour Engineering QUESTIONS AND ANSWERS available in next pages

    Health is the greatest gift, contentment is the greatest wealth -Buddha
Too many of us are not living our dreams because we are living our fears.- Les Brown