76. The particular places where pedestrians are to cross the pavement are properly marked by the pavement marking known as
A. stop lines
B. turn markings
C. crosswalk lines
D. lane lines
Explanation:
77. Select the incorrect statement.
A. Stop or red time of a signal is the sum of go and clearance intervals for the cross flow.
B. Go or green time of a signal is the sum of stop and clearance intervals for the cross flow.
C. Clearance time is generally 3 to 5 seconds.
D. The cycle length is normally 40 to 60 seconds for two phase signals.
Explanation:
78. Centre line markings are used
A. to designate traffic lanes
B. in roadways meant for two way traffic
C. to indicate that overtaking is not permitted
D. to designate proper lateral placement of vehicles before turning to different directions
Explanation:
79. The provision of traffic signals at intersections
A. reduces right angled and rear end collisions
B. increases right angled and rear end collisions
C. reduces right angled collisions but may increase rear end collisions
D. reduces rear end collisions but may increase right angled collisions
Explanation:
80. As per IRC recommendations, the average level of illumination on important roads carrying fast traffic is
A. 10 lux
B. 15 lux
C. 20 lux
D. 30 lux
Explanation: