96. In a shunting signal if the red band is inclined at 45� it indicates
A. stop
B. proceed
C. proceed cautiously
D. none of the above
Explanation:
97. A treadle bar is used for
A. interlocking points and signal
B. setting points and crossings
C. setting marshalling yard signals
D. track maintenance
Explanation:
98. Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ?
A. triangle
B. turntable
C. traverser
D. scotch block
Explanation:
99. A train is hauled by 2-8-2 locomotive with 22.5 tonnes and on each driving axle. Assuming the coefficient of rail-wheel friction to be 0.25, what would be the hauling capacity of the locomotive?
A. 15.0 tonnes
B. 22.5 tonnes
C. 45.0 tonnes
D. 90.0 tonnes
Explanation:
100. Consider the following statements: Automatic signalling system results in # greater risk # higher efficiency # avoidance of block instruments # higher operating cost Of these statements
A. I and 2 are correct
B. 3 and 4 are correct
C. 1 and 4 are correct
D. 2 and 3 are correct
Explanation: