96. In a shunting signal if the red band is inclined at 45� it indicates
Explanation:
97. A treadle bar is used for
Explanation:
98. Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ?
Explanation:
99. A train is hauled by 2-8-2 locomotive with 22.5 tonnes and on each driving axle. Assuming the coefficient of rail-wheel friction to be 0.25, what would be the hauling capacity of the locomotive?
Explanation:
100. Consider the following statements:
Automatic signalling system results in
# greater risk
# higher efficiency
# avoidance of block instruments
# higher operating cost Of these statements
Explanation: