26. Generally the detention period for grit chambers is kept as
Explanation:
27. If Biochemical oxygen demand (BOD) of a town is 20000 kg/day and BOD per capita per day is 0.05 kg, then population equivalent of town is
Explanation:
28. If the sewage contains grease and fatty oils, these are removed in
Explanation:
29. Sewerage system is designed for
Explanation:
30. The pipe which is used to carry the discharge from sanitary fittings like bath rooms, kitchens etc. is called
Explanation: