Home > Civil Engineering > Docks and Harbour Engineering

Docks and Harbour Engineering - Interview Questions and Answers

Prepare for your technical interview with these Docks and Harbour Engineering questions.

Ready to test your skills?

Take a timed mock test specifically for Docks and Harbour Engineering.

Start Mock Test
31. When a ship floats at its designed water line, the vertical distance from water line to the bottom of the ship is known as
A. beam
B. depth
C. freeboard
D. draft
Explanation:
32. By increasing the rise of lock gates, (i) the length of the lock gate will increase (ii) transverse stress due to water pressure on the gate will increase (iii) compressive force on the gate will increase Of these statements
A. (i) and (ii) are correct
B. (i) and (iii) are correct
C. Only (ii) is correct
D. Only (iii) is correct
Explanation:
33. The difference in height between highest high water and lowest low water is called
A. mean range
B. maximum range
C. maximum rise
D. mean rise
Explanation:
34. At a given port, the fetch is 400 nautical miles, the maximum height of storm wave will be
A. 2.073 m
B. 8.169 m
C. 9.144 m
D. 6.8 m
Explanation: