26.Lead of crossing is the distance from the

heel of the switch to the toe of the switch
heel of the switch to the theoretical nose of the crossing
toe of the switch to the theoretical nose of crossing
toe of the switch to the actual nose of crossing

27.Normally maximum cant permissible in Meter Gauge is

75 mm
90 mm
140 mm
165 mm

More Railway Engineering QUESTIONS AND ANSWERS available in next pages